Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Statistic Project

You are required to rework this project. Using international trip from Portland, Oregon to Lagos Nigeria from the last 4 years. In each powerpoint slide, provide talking points/notes as well.

Use of Minitab will help the analysis.

Course Project

Select an activity or process you engage in on a regular basis. Examples include the following:

o . International Travel. From US To Nigeria in the last 4 years. From 2012 to date. You will measure Outbound, Return flights time and as well as the cost. I

Select a metric/performance measure, for the activity/process you selected.

For example, if you select going to and from work, a possible metric would be the time it takes to travel in each direction.

Collect data for the activity/process over the course of the term.

Graph the data and calculate summary measures, using a variety of graphical tools.

• Make a short presentation (10-15 minutes) during the last class session.
Your presentation should include the following:

1. A title page.
2. A description of the activity/process selected.
3. The metric used to measure performance.
4. The actual data collected.
5. The graph(s) and summary measures used to analyze the data.
6. Your analysis/conclusions based on the graph(s) and summary measures.
7. Final observations. What difficulties, if any, were encountered? What key learning occurred for you as a result of carrying out this project?

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes