Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Performance Management

Performance Management
Paper details:
Talk about Performance management indept comparing singapore and china on different segmentation

You can leave a response, or trackback from your own site.

Leave a Reply

Performance Management

Performance Management
This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this
assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule
(Submit as one [1] Microsoft Project file)

1.Create a multilevel work breakdown structure (WBS) and detailed project schedule based upon the information from Appendix 13.2. The text is “Project Management” The
Managerial Process the sixth ed. by Erik W. Larson/ Clifford F. Gray. McGraw Hill Education

Part B: Written Response
(Submit as a Microsoft Word file)

Write a one to two (1-2) page response in which you:

1.Summarize the project’s performance in terms of schedule and costs..

2.Recommend corrective actions (at least two [2] total) to improve the project’s performance. .

3.Give your opinion on what you foresee as the greatest risk to the project..

4.Format your assignment according to the following formatting requirements:
◦Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides..

◦Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page is not included
in the required page length..

.

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Performance Management

Performance Management
This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this
assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule
(Submit as one [1] Microsoft Project file)

1.Create a multilevel work breakdown structure (WBS) and detailed project schedule based upon the information from Appendix 13.2. The text is “Project Management” The
Managerial Process the sixth ed. by Erik W. Larson/ Clifford F. Gray. McGraw Hill Education

Part B: Written Response
(Submit as a Microsoft Word file)

Write a one to two (1-2) page response in which you:

1.Summarize the project’s performance in terms of schedule and costs..

2.Recommend corrective actions (at least two [2] total) to improve the project’s performance. .

3.Give your opinion on what you foresee as the greatest risk to the project..

4.Format your assignment according to the following formatting requirements:
◦Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides..

◦Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page is not included
in the required page length..

.

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes