icon

Usetutoringspotscode to get 8% OFF on your first order!

OPS 571 Production Plan for Riordan Manufacturing

Write a paper of no more than 1,050 words discussing strategic capacity planning and lean production for the new process design and supply chain process for the electric fans at Riordan.

· Conclusion

· At least three references (at least two from scholarly journals from the Library)

Format your paper consistent with APA guidelines.

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes