Estimating and Tender Process

Estimating and Tender Process

Paper details:

A client requires the anticipated cost of a new three storey office building comprising a gross
floor area of 3600m2 to be located in Durham.
It is anticipated that the project will be tendered in January 2016 using competitive Design and
Build.
The site is approximately 3500m2.
You should assume that the gross floor area of the proposed building is spread equally over the
three floors.
A similar project was carried out for the same client for an office located in Cambridge and
procured by single stage competitive tender in September 2012. The cost exclusive of
Preliminaries, for the building, was £1150 per m2. The combined element unit cost of the
external works measured over all hard and soft landscaping was £78 per m2.
Based on this information and with reference to BCIS on-line for any further cost information
you require, prepare an order of cost estimate stating any assumptions and exclusions.
As the client is also considering negotiating with the previous contractor, indicate the likely
impact on your estimate.

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Estimating and Tender Process

Estimating and Tender Process

Paper details:

A client requires the anticipated cost of a new three storey office building comprising a gross
floor area of 3600m2 to be located in Durham.
It is anticipated that the project will be tendered in January 2016 using competitive Design and
Build.
The site is approximately 3500m2.
You should assume that the gross floor area of the proposed building is spread equally over the
three floors.
A similar project was carried out for the same client for an office located in Cambridge and
procured by single stage competitive tender in September 2012. The cost exclusive of
Preliminaries, for the building, was £1150 per m2. The combined element unit cost of the
external works measured over all hard and soft landscaping was £78 per m2.
Based on this information and with reference to BCIS on-line for any further cost information
you require, prepare an order of cost estimate stating any assumptions and exclusions.
As the client is also considering negotiating with the previous contractor, indicate the likely
impact on your estimate.