Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Design, development and fielding of the Boeing 777 used modeling and simulation

Design, development and fielding of the Boeing 777 used modeling and simulation
For all assignments strive for clarity and answer the question(s) directly.

Assignment Details:

The design, development and fielding of the Boeing 777 used modeling and simulation to a much greater extent, and with better results than previous Boeing aircraft. Compared with traditional design techniques used for the Boeing 757 and 767 designs, which involved physical mockups, the virtual process resulted in many design efficiencies. See the course reading- Boeing 777: Use of Modeling and Simulation in Systems Design. Boeing777CaseStudy-2008-1.pdf Also see the business case study on the Boeing 777 Boeing 777CaseStudy cohen2000.pdf Describe these design efficiencies and briefly explain how the use of M&S facilitated design and fielding of the aircraft. You may want to use other references as the Boeing 777 design process has frequently been used as a case study. See also http://en.wikipedia.org/wiki/Boeing_777 for more information.

watch one of these segments, I suggest 1.3 “Setting up interoperability among design teams.”
1.1

Overview

1.2


Agreement with United Airlines to order 777- necessary to start development. Full sized mockup of plane’s interior built. Boeing agrees to work closely with United in design and development.

1.3


Setting up interoperability among design teams.

1.4


Testing begins – both live and virtual.
1.5

Concerns at Boeing about meeting development schedule and need for recovery plan.

1.6

Quality control of initial manufactured parts.

Part 2- The Sum of its Parts

2.1

Design changes and impact on program development.

2.2

Testing the wing- the first large assembled component.

2.3

Aluminum-Lithium parts reduce weight but pose a problem with minor but visible cracking during development and testing. Decision not to use that material caused problems with design and schedule.

2.4

Managing design changes- impact on small vendors

2.5

First wing completed.

2.6

You can leave a response, or trackback from your own site.

Leave a Reply

Design, development and fielding of the Boeing 777 used modeling and simulation

Design, development and fielding of the Boeing 777 used modeling and simulation
For all assignments strive for clarity and answer the question(s) directly.

Assignment Details:

The design, development and fielding of the Boeing 777 used modeling and simulation to a much greater extent, and with better results than previous Boeing aircraft. Compared with traditional design techniques used for the Boeing 757 and 767 designs, which involved physical mockups, the virtual process resulted in many design efficiencies. See the course reading- Boeing 777: Use of Modeling and Simulation in Systems Design. Boeing777CaseStudy-2008-1.pdf Also see the business case study on the Boeing 777 Boeing 777CaseStudy cohen2000.pdf Describe these design efficiencies and briefly explain how the use of M&S facilitated design and fielding of the aircraft. You may want to use other references as the Boeing 777 design process has frequently been used as a case study. See also http://en.wikipedia.org/wiki/Boeing_777 for more information.

watch one of these segments, I suggest 1.3 “Setting up interoperability among design teams.”
1.1
http://www.youtube.com/watch?v=01PjWv7eqAk
Overview

1.2

http://www.youtube.com/watch?v=I0pU4UU2jzI&feature=relmfu
Agreement with United Airlines to order 777- necessary to start development. Full sized mockup of plane’s interior built. Boeing agrees to work closely with United in design and development.

1.3

http://www.youtube.com/watch?v=ryTcPHYTnUo&feature=relmfu
Setting up interoperability among design teams.

1.4

http://www.youtube.com/watch?v=x1EArNZcRjU&feature=relmfu
Testing begins – both live and virtual.
1.5
http://www.youtube.com/watch?v=FsCS6OpOYEM&feature=relmfu
Concerns at Boeing about meeting development schedule and need for recovery plan.

1.6

http://www.youtube.com/watch?v=BPjIVwp01GNmY&feature=relmfu

Quality control of initial manufactured parts.

Part 2- The Sum of its Parts

2.1
http://www.youtube.com/watch?v=gZ8kSqOS_H4&feature=relmfu

Design changes and impact on program development.

2.2
http://www.youtube.com/watch?v=1Pptlf_LyBI&feature=relmfu

Testing the wing- the first large assembled component.

2.3
http://www.youtube.com/watch?v=x1EArNZcRjU&feature=watch_response_rev

Aluminum-Lithium parts reduce weight but pose a problem with minor but visible cracking during development and testing. Decision not to use that material caused problems with design and schedule.

2.4
http://www.youtube.com/watch?v=0RxZ3sT5G2c&feature=relmfu

Managing design changes- impact on small vendors

2.5
http://www.youtube.com/watch?v=3k3Xt4KxAS0

First wing completed.

2.6
http://www.youtube.com/watch?v=_JzsByvy3hY&feature=relmfu

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Design, development and fielding of the Boeing 777 used modeling and simulation

Design, development and fielding of the Boeing 777 used modeling and simulation
For all assignments strive for clarity and answer the question(s) directly.

Assignment Details:

The design, development and fielding of the Boeing 777 used modeling and simulation to a much greater extent, and with better results than previous Boeing aircraft. Compared with traditional design techniques used for the Boeing 757 and 767 designs, which involved physical mockups, the virtual process resulted in many design efficiencies. See the course reading- Boeing 777: Use of Modeling and Simulation in Systems Design. Boeing777CaseStudy-2008-1.pdf Also see the business case study on the Boeing 777 Boeing 777CaseStudy cohen2000.pdf Describe these design efficiencies and briefly explain how the use of M&S facilitated design and fielding of the aircraft. You may want to use other references as the Boeing 777 design process has frequently been used as a case study. See also http://en.wikipedia.org/wiki/Boeing_777 for more information.

watch one of these segments, I suggest 1.3 “Setting up interoperability among design teams.”
1.1
http://www.youtube.com/watch?v=01PjWv7eqAk
Overview

1.2

http://www.youtube.com/watch?v=I0pU4UU2jzI&feature=relmfu
Agreement with United Airlines to order 777- necessary to start development. Full sized mockup of plane’s interior built. Boeing agrees to work closely with United in design and development.

1.3

http://www.youtube.com/watch?v=ryTcPHYTnUo&feature=relmfu
Setting up interoperability among design teams.

1.4

http://www.youtube.com/watch?v=x1EArNZcRjU&feature=relmfu
Testing begins – both live and virtual.
1.5
http://www.youtube.com/watch?v=FsCS6OpOYEM&feature=relmfu
Concerns at Boeing about meeting development schedule and need for recovery plan.

1.6

http://www.youtube.com/watch?v=BPjIVwPGNmY&feature=relmfu

Quality control of initial manufactured parts.

Part 2- The Sum of its Parts

2.1
http://www.youtube.com/watch?v=gZ8kSqOS_H4&feature=relmfu

Design changes and impact on program development.

2.2
http://www.youtube.com/watch?v=1Pptlf_LyBI&feature=relmfu

Testing the wing- the first large assembled component.

2.3
http://www.youtube.com/watch?v=x1EArNZcRjU&feature=watch_response_rev

Aluminum-Lithium parts reduce weight but pose a problem with minor but visible cracking during development and testing. Decision not to use that material caused problems with design and schedule.

2.4
http://www.youtube.com/watch?v=0RxZ3sT5G2c&feature=relmfu

Managing design changes- impact on small vendors

2.5
http://www.youtube.com/watch?v=3k3Xt4KxAS0

First wing completed.

2.6
http://www.youtube.com/watch?v=_JzsByvy3hY&feature=relmfu

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes