Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

cost and mesurment

Description:

All things. The excel sheet I give copy this one u need to fill and follow instruction read all papers and plan and book attachment then type in excel and measueremnt on in it the total in right and description on left

AS1 – TAKING OFF AND BILL OF QUANTITIES- SUBSTRUCTURE (50% of Module marks)

Countryside Properties Ltd is a popular developer for affordable housebuilding in the UK. They have recently awarded the ‘Regeneration North’ residential project, located in Gateacre, Liverpool. This new development comprises of a range of 3, 4 and 5 bedroom detached and semi-detached homes (Project information are available under ‘Assignment’ section on BB). You are to assume the role of a quantity surveyor for this project and your company has requested you to
a)Prepare a detailed quantity take-off for the substructure of LONGFORD house
b)Prepare and price a firm BoQ for substructure of LONGFORD house type.

Marking Criteria (AS1) Weighting %
•Correct use of measurement guidelines and quantity take-off rules (5%)
•Accuracy of calculations including appropriate adjustments (10%)15%
Take off quantities of substructure
•Take-off check list for substructure items (5%)
•Compilation of appropriate descriptions from the drawings and specification (10%)
•Quantification based on NRM2 (20%)

35%

BoQ and estimating
•Abstracting the measured quantities in to BoQ (10%)
•Prepare a firm BoQ based on measured items (20%)
•Price the bill items using industry standards (price books)
Follow the appropriate sections of price book and price those BoQ items (20%)

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes