Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Construction Assignment.

CMGT 306-1: Construction Site Operations Spring 2017  Assignment No. 2 REVISED 2/17/17 Each student to develop a site logistics plan Include adjacent streets  Show building orientation on site  Prepare a project site layout and organizational plan (graphically and narratively)   At a minimum your plan should include: • A site logistics plan for the mobilization phase of the project (from mobilization through demolition). • A site logistics plan for the rough-in phase of the project. • A site logistics plan for the finishes phase of the project until substantial completion. At a minimum you should address: • Jobsite access to and from the worksite; for workers, occupants, public. • Temporary facilities; utilities, offices, storage, sanitary. • Materials handling; material movement, delivery, storage, and handling. • Security, safety, and signage; both inside and outside. • Communications to owner, occupants, public. • Work sequence, policies, and procedures  No presentations in class Since no presentations, provide a written narrative of the work sequence and complete explanation of the plan.  This narrative shall be as if you are presenting this to your client and explaining what your plan is and defending it. Any data not identified on the plan but included in your concept shall be defined in the narrative.

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes