Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Civil Engineering Common Room

Taking the drawings from stages 3 and 5, identify the positions of foundations, retaining walls, columns, bracing, lift core walls, stair supports, floor beams, and roof structure.
Explain your reasoning for configuring your structure in this way from an architectural, sustainability, and engineering perspective. This may include some of the products identified within stage 4. Full set of general arrangement floor plans with structure.
1100 word report (plus diagrams) justifying arrangement of space from a structural perspective.

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes