icon

Usetutoringspotscode to get 8% OFF on your first order!

Civil Engineering

According to the instruction (solicitation file ) I need to write methodology , Analysis results and discussion following the lab rubric guide . So I will briefly explain this lab . first of all I did the design on autocad and watergems software ( capture file ) , then I enter the elevation for the pipes .Also, i made a resevior for the first two pipes and the elevation was 7100. the hand calculation attachment was to find the demand . so the results will be in the junction , table pipes and resevior attachment . to write the discussion you should follow the deliverables respect to the objectives which is on the solicitation attachment

You can leave a response, or trackback from your own site.

Leave a Reply

Civil Engineering

Paper details:use easy grammar and easy word. Do not make the sentences complicated.
1- a proposal about a case study or any location about chromium contamination in groundwater problem and do fate and transport on it and write a proposal
2- 2- to propose using fate and transport modeling and to know the concentration of the chromium in the groundwater
3- use file named (The Transport and Fate of Cr(VI) in the Environment) it has 3 case study and it can be used in the review part. and you can do something related to the case studies.
4- you can add the references , but you need to sited and I need more than 10 references.
5- you must add some background about the chromium and it sources in the environment and by the man made.
5- 1 page summary after 5 days

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes