Analyze the funding of the building of the City Hall (assume that the site is already owned by the City and has been cleared and made ready for construction), and
describing steps used to raise the required money. This analysis should include a discussion of the financing structure actually used by the City, the benefits and
difficulties which resulted from this financing structure, a discussion of the credit issues which were discussed in the original offering of the LTGO Bonds. Track and
compare projected and actual tax revenues available to pay the LTGO Bonds through 2014. Also, describe any issues caused by the delay in the construction of the City
Hall