Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

After an earthquake in Taiwan: Risks in managing logistics and supply chains.

Topic: After an earthquake in Taiwan: Risks in managing logistics and supply chains.

The Introduction section should be only 1/2 page with focus on risk management methods studied. I must evaluate your understanding of the risk tools, processes and methods we have studied in PMAN 637.
1.  Introduction (1/2 page)
2.  Risk Identification (5 pages)
Data and phrasing should be summarized, following PMBOK Guide worldwide standards (PMI, 2017).  Risks in your chosen topic must be identified relating to scope, schedule, resources and budget

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes