Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

As a result of a new manufacturing process, the Hi-Jinx Chemical Company is generating a new waste stream.

As a result of a new manufacturing process, the Hi-Jinx Chemical Company is generating a new waste stream. The waste has the following properties: pH = 10; flashpoint = 75ºF; high concentrations of Cd and Cr (exceeds TCLP limits); approximately 2500 lb/mos. Based on the waste alone, is the generator a LQG, SQG, or CESQG? Must the generator comply with DOT regulations for packaging the wastes and placarding the vehicles? For how long can the generator stockpile waste on-site without a permit? Is there a requirement for the submission of a written emergency response plan to the state environmental agency? Is the waste generated corrosive, ignitable or toxic? Can the waste be stored in a single-lined tank on premises? To what type of facility (e.g. state-approved, EPA-approved) must the waste be shipped for final disposal?

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes