Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Define a work breakdown structure and describe the methodology behind constructing one.

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.OverviewAs the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the companys campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.Deliverable 1: Summary (MS Word or open source equivalent)1. Write a one to two (1-2) page summary document in which you:a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).b. Define a work breakdown structure and describe the methodology behind constructing one.Deliverable 2: WBS (MS Project or open source equivalent)2. Use Microsoft Project to create a WBS which:a. Contains at least five (5) main tasks, one for each of the PMBOK process areas.b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.c. Contains Work Breakdown Structure Code for each task.d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes