icon

Usetutoringspotscode to get 8% OFF on your first order!

Lean manufacturing

The instructions on the file attached.. value stream map that done so far in pdf file..

*note

TAKT Time is “Available Time/Total Demand For That Time Period”

It depends what you wan to do. Do you want to get the TAKT time for one product; then do it for one product

You can leave a response, or trackback from your own site.

Leave a Reply

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes