Manitoba: Red River Floodway Project (expansion project)
1. A short introduction including the location of the case study, and the hazard and risk being mitigated
2. A description of the mitigation strategy
3. The costs and benefits of the strategy, including the impact on people and property
4. Public and Community support and/or opposition to the project