Each group must analyse the desired construction systems (as annotated on the drawings) and provide:
(a) (b) (c) (d) (e)
All this
1. 2.
a preliminary budget cost for the project, based on current and commercially available cost data – task due Week 3
a preliminary time schedule for the project development from DA to hand-over using hand-drawn or computer based (MS Project or similar) Gantt chart, – task due Week 4
reproduce a ArchiCAD drawing of this building or using similar computer graphics, or a scaled hand drawing of this building – task due Week 5
a recommendation for a project delivery method, giving clear reasoning for the desired pro-forma contract – task due Week 6,
detailed specification for two building systems plus one fit-out trade in Reception or the Café area – task due Week 7, and
information must be presented in a logical sequence in two formats:
in a written report, – task due Week 9, before the Christmas break, and
as a verbal and visual (PowerPoint) presentation to fellow students in your allocated tutorial timeslots – task due Weeks 10 or 11, after the Christmas break.