Usetutoringspotscode to get 8% OFF on your first order!

  • time icon24/7 online - support@tutoringspots.com
  • phone icon1-316-444-1378 or 44-141-628-6690
  • login iconLogin

Construction Technology 6

Construction Technology 6
ASSIGNMENT 2:

HYDRAULIC SERVICES

The plans, elevations and section for a proposed fitness centre development are available on vUWS. They include six A3
sheets numbered DA-101; DA-102; DA-103; DA201; DA-202 and DA-301. The project is located in Rockhampton, on the
central coast Queensland.

Assume that each of the following is available:
Sewer:

DN150 sewer located in the nature strip to the southern footpath of the road, with an assumed
invert level of RL 41.500. Sanitary drainage will connect to this main via a sewer boundary trap
(SBT) located within the property on the northern boundary. Design is required to upstream
side of SBT only.

Stormwater:

Stormwater will discharge to a below-grade SDT in southern boundary carpark (see location
and plan dimensions on drawing) and then to the western kerb of the street. The gutter
discharge RL will need to be determined as part of the exercise. Use rainfall intensity data for
Rockhampton based on 20 minute duration (10 year ARI) and accept that Local Council
requires a design based on maximum 90L/s/Ha allowable runoff (i.e. your exercise is to
nominate the SDT depth based on inflow versus allowable outflow at the 20minute peak).

Potable water: DN100 main located in western footpath to the street, with invert at a constant 1.0m below
footpath. The supply authority can only guaranteed a pressure of 18mH and because it is in a
new growth area of the city, you need to install a surge tank as the mandatory design. You
must achieve 150kPa at the most disadvantaged outlet. Consider carefully the facilities and
determine overall capacity (mH and L/s) for a pressure set serving the development from a
surge tank location that you will note on your drawings.

Assessment Criteria
Using your appreciation of hydraulics installations to all levels of the building (Under-floor, ground and first floors
and roof), determine the following noting that you will be assessed on the points in each section:

1. Cold Water Supply System [40% of assignment 2]
Recommend a reticulation system. Provide a single line diagram of the system, indicating pressure zones,
loading units, select pipe sizes to limit velocity to acceptable limits and pressure sets requirements.
a). Single line diagram
?
?

Loading units
Pipe sizes

b). Pressure set capacity (in mH and Q)

[15% overall]
[10% overall]
[15% overall including surge tank location]

2. Roof Areas Drainage System [40% of assignment 2]
Design the stormwater drainage system. Provide a single line diagram showing the collection system, including
flow rates, pipe sizes and falls to detention tank, the location of which is at your discretion. Determine detention
tank capacity.
Page 1 of 3

a). Assumptions
?

Storm intensity calculations

[20% overall]

?

Capacity calculations

[20% overall]

b). OSD tank

3. Sanitary Plumbing and Drainage System [20% of assignment 2]
Design the sanitary plumbing and sanitary drainage system, including sizing of pipe work from pans, urinals,
basins, showers and sinks. The single line diagram should extend to the connection with the authorities system,
including the desired invert levels where applicable.
a). Pipe work sizing
? FU loadings
b). Single line diagram

[10% overall]

? Layout and pipe sizes

[10% overall]

Standards

Criteria

Unsatisfactory
[Fail]

Satisfactory
[Pass]

Good
[Credit]

Very Good
[Distinction]

Excellent
[High
Distinction]

Marks
awarded
(maximum
100 which
will be
multiplied by
0.15)

< 50 points

50 – 64 points

65 – 74 points

75 – 84 points

85 – 100
points

Hydraulics
design

Very poor or no
assumptions
Diagrams
inadequate or
incomplete
Incomplete
schematic
Section(s) of
assignment
missing

Adequate
assumptions
with capacity
to operate
effectively
Schematic
acceptable
All requests
included

Assumptions
fully inclusive
and detailing
sizes, grades,
venting etc.
Clear
evidence of
critical
thought in
logistics and
schematic
presentation

Professional
submission
encompassing
all
requirements
in a realistic
resolution

Basic
assumptions
but needing
justification
Very basic
schematic
Little thought
in logistics

Learning Outcomes Addressed
?

Interpret building regulations

?

Regulatory knowledge

?

Communicate professionally within regulatory frameworks

?

Recognise environmental connections with built form

Assignment weight:

15% of group work

Due Date:

Week 8 (handed-in during tutorial)

Page 2 of 3

School of Engineering

ASSIGNMENT/REPORT COVER SHEET
This sheet must be attached to all material being submitted for marking.

Student names:
Student numbers:
Unit name and number:

300725 Construction Technology 6 (Services)

Tutorial group:
Tutorial day and time:
Lecturer/Tutor:
Title of assignment:

Assignment 2

Length:
Date due:
Date submitted:
Campus enrolment:

Penrith

Project Leader Declaration (must be signed)
Declaration:
? I hold a copy of this assignment if the original is lost or damaged.
? I hereby certify that no part of this assignment or product has been copied from any other student’s work or from any
other source except where due acknowledgement is made in the assignment.
? No part of the assignment/product has been written/produced for me by any other person except where collaboration has
been authorised by the subject lecturer/tutor concerned
? I am aware that this work may be reproduced and submitted to plagiarism detection software programs for the purpose of
detecting possible plagiarism (which may retain a copy on its database for future plagiarism checking))

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Construction Technology 6

Construction Technology 6
ASSIGNMENT 2:

HYDRAULIC SERVICES

The plans, elevations and section for a proposed fitness centre development are available on vUWS. They include six A3
sheets numbered DA-101; DA-102; DA-103; DA201; DA-202 and DA-301. The project is located in Rockhampton, on the
central coast Queensland.

Assume that each of the following is available:
Sewer:

DN150 sewer located in the nature strip to the southern footpath of the road, with an assumed
invert level of RL 41.500. Sanitary drainage will connect to this main via a sewer boundary trap
(SBT) located within the property on the northern boundary. Design is required to upstream
side of SBT only.

Stormwater:

Stormwater will discharge to a below-grade SDT in southern boundary carpark (see location
and plan dimensions on drawing) and then to the western kerb of the street. The gutter
discharge RL will need to be determined as part of the exercise. Use rainfall intensity data for
Rockhampton based on 20 minute duration (10 year ARI) and accept that Local Council
requires a design based on maximum 90L/s/Ha allowable runoff (i.e. your exercise is to
nominate the SDT depth based on inflow versus allowable outflow at the 20minute peak).

Potable water: DN100 main located in western footpath to the street, with invert at a constant 1.0m below
footpath. The supply authority can only guaranteed a pressure of 18mH and because it is in a
new growth area of the city, you need to install a surge tank as the mandatory design. You
must achieve 150kPa at the most disadvantaged outlet. Consider carefully the facilities and
determine overall capacity (mH and L/s) for a pressure set serving the development from a
surge tank location that you will note on your drawings.

Assessment Criteria
Using your appreciation of hydraulics installations to all levels of the building (Under-floor, ground and first floors
and roof), determine the following noting that you will be assessed on the points in each section:

1. Cold Water Supply System [40% of assignment 2]
Recommend a reticulation system. Provide a single line diagram of the system, indicating pressure zones,
loading units, select pipe sizes to limit velocity to acceptable limits and pressure sets requirements.
a). Single line diagram
?
?

Loading units
Pipe sizes

b). Pressure set capacity (in mH and Q)

[15% overall]
[10% overall]
[15% overall including surge tank location]

2. Roof Areas Drainage System [40% of assignment 2]
Design the stormwater drainage system. Provide a single line diagram showing the collection system, including
flow rates, pipe sizes and falls to detention tank, the location of which is at your discretion. Determine detention
tank capacity.
Page 1 of 3

a). Assumptions
?

Storm intensity calculations

[20% overall]

?

Capacity calculations

[20% overall]

b). OSD tank

3. Sanitary Plumbing and Drainage System [20% of assignment 2]
Design the sanitary plumbing and sanitary drainage system, including sizing of pipe work from pans, urinals,
basins, showers and sinks. The single line diagram should extend to the connection with the authorities system,
including the desired invert levels where applicable.
a). Pipe work sizing
? FU loadings
b). Single line diagram

[10% overall]

? Layout and pipe sizes

[10% overall]

Standards

Criteria

Unsatisfactory
[Fail]

Satisfactory
[Pass]

Good
[Credit]

Very Good
[Distinction]

Excellent
[High
Distinction]

Marks
awarded
(maximum
100 which
will be
multiplied by
0.15)

< 50 points

50 – 64 points

65 – 74 points

75 – 84 points

85 – 100
points

Hydraulics
design

Very poor or no
assumptions
Diagrams
inadequate or
incomplete
Incomplete
schematic
Section(s) of
assignment
missing

Adequate
assumptions
with capacity
to operate
effectively
Schematic
acceptable
All requests
included

Assumptions
fully inclusive
and detailing
sizes, grades,
venting etc.
Clear
evidence of
critical
thought in
logistics and
schematic
presentation

Professional
submission
encompassing
all
requirements
in a realistic
resolution

Basic
assumptions
but needing
justification
Very basic
schematic
Little thought
in logistics

Learning Outcomes Addressed
?

Interpret building regulations

?

Regulatory knowledge

?

Communicate professionally within regulatory frameworks

?

Recognise environmental connections with built form

Assignment weight:

15% of group work

Due Date:

Week 8 (handed-in during tutorial)

Page 2 of 3

School of Engineering

ASSIGNMENT/REPORT COVER SHEET
This sheet must be attached to all material being submitted for marking.

Student names:
Student numbers:
Unit name and number:

300725 Construction Technology 6 (Services)

Tutorial group:
Tutorial day and time:
Lecturer/Tutor:
Title of assignment:

Assignment 2

Length:
Date due:
Date submitted:
Campus enrolment:

Penrith

Project Leader Declaration (must be signed)
Declaration:
? I hold a copy of this assignment if the original is lost or damaged.
? I hereby certify that no part of this assignment or product has been copied from any other student’s work or from any
other source except where due acknowledgement is made in the assignment.
? No part of the assignment/product has been written/produced for me by any other person except where collaboration has
been authorised by the subject lecturer/tutor concerned
? I am aware that this work may be reproduced and submitted to plagiarism detection software programs for the purpose of
detecting possible plagiarism (which may retain a copy on its database for future plagiarism checking))

Responses are currently closed, but you can trackback from your own site.

Comments are closed.

Powered by WordPress | Designed by: Premium WordPress Themes | Thanks to Themes Gallery, Bromoney and Wordpress Themes